Discover the dramatic transformation of the Outsourced Parts Warehouse at Electrical Factory No. 1, as presented by the Innovation and Culture Team on July 4, 2016. This H5 work showcases the active efforts and innovative optimization in the lean benchmark line construction process. The warehouse has undergone significant changes, from overall layout to FIFO, channel optimization, inventory reduction, and visualization, showcasing a clean, organized, precise, and efficient management system. Using Eqxiu.com's online design platform, with a rich variety of templates available for quick creation, this work highlights the continuous improvement of the lean culture. The content includes insights into the changes in the preparation area, the challenges faced by the warehouse team, and their dedication to lean production. Join the journey to see the incredible transformation and cheer them on! With Eqxiu.com, anyone can create engaging H5 works effortlessly.